limitation of the study for project report

LIMITATIONS OF THE STUDY

1)      Time is the main constraint in completing the study within the stipulated period allowed. It has become difficult to analyze all the documents in detail.
2)      The analysis is made on the basis of secondary data only.
3)      The availability of data is only pertaining to five years is one of the constraints.
4)      As there is more dependency on secondary data realistic conclusion may not be possible to be made.

5)      Even though no. of techniques are available for analyzing financial position only ratio analysis has been taken for the study.

Comments

Contact Form

Name

Email *

Message *

Popular posts from this blog

Research Gap for security analysis

MBA Project titles On GST

synopsis Internet banking